ISO 27001 to SOC 2 Control Mapping: All 93 Annex A Controls

Reviewed by Ali Aleali, CISSP, CCSP · Last reviewed October 11, 2026

In our experience, a SOC 2 program covers roughly 70 percent of the work for ISO 27001 certification. The policies carry over, and most controls need only small adjustments. By direct mapping, the SOC 2 Security criteria (CC1 to CC9) cover 40 of the 93 ISO 27001:2022 Annex A controls in our mapping spreadsheet, about 43 percent. The other 53 have no direct Security criterion and count as new work for a SOC 2 holder.

This post is the reverse of the SOC 2 to ISO 27001 control mapping, which starts from each SOC 2 criterion. Here every row starts from an Annex A control, in the same order the Statement of Applicability lists them, and shows the SOC 2 criteria that map to it, the coverage, and what a SOC 2 holder still has to build.

Key insight

ISO 27001 vs ISO 27002 in this mapping

ISO 27001 is the ISMS standard that organizations certify against. ISO 27002 is the implementation guide for the same 93 controls, with identical numbering (5.x, 6.x, 7.x, 8.x). The tables below use the ISO 27001:2022 Annex A numbers, which are the same in both documents.

Key insight

Not sure where your ISO 27001 gaps are?

Answer 20 questions and get a personalized readiness score based on your existing security posture. Take the ISO 27001 Readiness Scorecard

How to Read These ISO 27001 to SOC 2 Mapping Tables

Each row maps one ISO 27001:2022 Annex A control to the SOC 2 Security criteria that map to it directly. The Coverage column uses three values from the mapping spreadsheet:

  • Full: the evidence produced for at least one mapped SOC 2 criterion satisfies the ISO 27001 control without adaptation. The same log, policy, or record goes into both audit packages.
  • Partial: every mapped SOC 2 criterion covers the intent of the control, but the evidence needs supplementing or reframing, typically by adding documented scope, extending a policy, or adding a step to an existing process.
  • Not covered: no SOC 2 Security criterion maps to the control directly. The last column names what a SOC 2 holder still has to build.

The Full and Partial ratings come from the overlap type the spreadsheet assigns to each SOC 2 criterion. Of the 40 covered controls, 34 are Full and 6 are Partial.

Annex A controls are grouped by theme: A.5 (organizational), A.6 (people), A.7 (physical), and A.8 (technological). Each SOC 2 criterion links to its own post, and each Annex A control with a dedicated post links to it.

Organizational Controls: A.5.1 to A.5.37

20 of the 37 ISO 27001 organizational controls map directly to a SOC 2 Security criterion. The 20 covered controls group as follows:

  • Policies, roles, and segregation of duties: A.5.1 to A.5.3, mapped to CC1.2, CC1.3, CC2.2, CC3.1, CC5.1, CC5.3, and CC6.3
  • Access: A.5.15, A.5.16, and A.5.18, mapped to CC6.1 to CC6.3
  • Suppliers: A.5.19, A.5.20, and A.5.22, mapped to CC9.2
  • Incidents: A.5.25 to A.5.27, mapped to CC7.3 to CC7.5
  • Continuity: A.5.29 and A.5.30, mapped to CC7.5 and CC9.1
  • Independent review: A.5.35, mapped to CC4.1 and CC4.2
  • Other organizational controls: A.5.6 and A.5.31 (CC2.3), A.5.8 (CC3.4), A.5.11 (CC6.5), and A.5.37 (CC5.3)

Four of the 20 are Partial: A.5.6, A.5.8, A.5.31, and A.5.35, because CC2.3, CC3.4, CC4.1, and CC4.2 each carry a Partial overlap rating.

Annex A controlControl nameSOC 2 criteria that map to itCoverageWhat a SOC 2 holder still has to build
A.5.1Policies for information securityCC3.1, CC5.1, CC5.3Full-
A.5.2Information security roles and responsibilitiesCC1.2, CC1.3, CC2.2Full-
A.5.3Segregation of dutiesCC6.3Full-
A.5.4Management responsibilities-Not covered-
A.5.5Contact with authorities-Not coveredRegister of regulator/authority contacts
A.5.6Contact with special interest groupsCC2.3Partial-
A.5.7Threat intelligence-Not coveredDocumented threat intelligence process
A.5.8Information security in project managementCC3.4Partial-
A.5.9Inventory of information and other associated assets-Not coveredFormal asset inventory scoped to the ISMS
A.5.10Acceptable use of information and other associated assets-Not coveredAcceptable use rules tied to the asset inventory
A.5.11Return of assetsCC6.5Full-
A.5.12Classification of information-Not coveredInformation classification scheme
A.5.13Labelling of information-Not coveredLabelling scheme applied to classified information
A.5.14Information transfer-Not coveredInformation transfer procedures and agreements
A.5.15Access controlCC6.1, CC6.3Full-
A.5.16Identity managementCC6.2Full-
A.5.17Authentication information-Not coveredAuthentication information (secrets) management procedure
A.5.18Access rightsCC6.2Full-
A.5.19Information security in supplier relationshipsCC9.2Full-
A.5.20Addressing information security within supplier agreementsCC9.2Full-
A.5.21Managing information security in the ICT supply chain-Not coveredICT supply chain security requirements
A.5.22Monitoring, review and change management of supplier servicesCC9.2Full-
A.5.23Information security for use of cloud services-Not coveredCloud service security requirements and exit process
A.5.24Information security incident management planning and preparation-Not coveredIncident management planning and preparation procedure
A.5.25Assessment and decision on information security eventsCC7.3Full-
A.5.26Response to information security incidentsCC7.4Full-
A.5.27Learning from information security incidentsCC7.5Full-
A.5.28Collection of evidence-Not coveredEvidence collection procedure for incidents
A.5.29Information security during disruptionCC7.5, CC9.1Full-
A.5.30ICT readiness for business continuityCC7.5, CC9.1Full-
A.5.31Legal, statutory, regulatory and contractual requirementsCC2.3Partial-
A.5.32Intellectual property rights-Not coveredIntellectual property rights procedure
A.5.33Protection of records-Not coveredRecords retention and protection schedule
A.5.34Privacy and protection of PII-Not coveredPrivacy and PII protection procedure
A.5.35Independent review of information securityCC4.1, CC4.2Partial-
A.5.36Compliance with policies, rules and standards for information security-Not coveredInternal compliance review against policies and standards
A.5.37Documented operating proceduresCC5.3Full-

The full ISO 27001 to SOC 2 mapping, in both directions, is a live Google Sheet. When the mapping is updated, everyone with the link sees the current version.

Free · Google Sheet

SOC 2 & ISO 27001 Control Mapping

Every SOC 2 Common Criterion mapped to ISO 27001:2022 Annex A, all 93 Annex A controls mapped back to SOC 2 with what a SOC 2 holder still has to build, and two sample control sets, kept current in a shared Google Sheet. Enter your email to open it.

Key insight

Notable gap in A.5.21

Managing information security in the ICT supply chain goes further than SOC 2's vendor management requirements. It requires an inventory of ICT suppliers, security requirements embedded in procurement contracts, and procedures for managing supplier-induced security incidents throughout the supply chain.

People Controls: A.6.1 to A.6.8

4 of the 8 ISO 27001 people controls map directly to a SOC 2 Security criterion. Screening, terms and conditions of employment, awareness training, and the disciplinary process (A.6.1 to A.6.4) map to CC1.1, CC1.4, CC1.5, and CC2.2. A.6.4 (disciplinary process) is Partial, because CC1.1 and CC1.5 each carry a Partial overlap rating.

Annex A controlControl nameSOC 2 criteria that map to itCoverageWhat a SOC 2 holder still has to build
A.6.1ScreeningCC1.4Full-
A.6.2Terms and conditions of employmentCC1.4Full-
A.6.3Information security awareness, education and trainingCC1.4, CC2.2Full-
A.6.4Disciplinary processCC1.1, CC1.5Partial-
A.6.5Responsibilities after termination or change of employment-Not coveredPost-termination responsibilities clause
A.6.6Confidentiality or non-disclosure agreements-Not coveredConfidentiality / NDA register
A.6.7Remote working-Not coveredRemote working policy
A.6.8Information security event reporting-Not coveredInformation security event reporting channel

Physical Controls: A.7.1 to A.7.14

4 of the 14 ISO 27001 physical controls map directly to a SOC 2 Security criterion. Perimeter, entry, storage media, and secure disposal (A.7.1, A.7.2, A.7.10, A.7.14) map to CC6.4 and CC6.5.

Annex A controlControl nameSOC 2 criteria that map to itCoverageWhat a SOC 2 holder still has to build
A.7.1Physical security perimetersCC6.4Full-
A.7.2Physical entryCC6.4Full-
A.7.3Securing offices, rooms and facilities-Not coveredSecure facilities and room designation
A.7.4Physical security monitoring-Not coveredPhysical security monitoring (e.g. CCTV, alarms)
A.7.5Protecting against physical and environmental threats-Not coveredEnvironmental threat protection assessment
A.7.6Working in secure areas-Not coveredSecure area working rules
A.7.7Clear desk and clear screen-Not coveredClear desk and clear screen policy
A.7.8Equipment siting and protection-Not coveredEquipment siting and protection standard
A.7.9Security of assets off-premises-Not coveredOff-premises asset security procedure
A.7.10Storage mediaCC6.5Full-
A.7.11Supporting utilities-Not coveredSupporting utilities resilience (power, HVAC)
A.7.12Cabling security-Not coveredCabling security standard
A.7.13Equipment maintenance-Not coveredEquipment maintenance schedule and records
A.7.14Secure disposal or re-use of equipmentCC6.5Full-

Key insight

Notable gap for SaaS organizations

The ten physical controls without a direct SOC 2 criterion split into two situations.

  • Data center controls: A.7.5, A.7.11, A.7.12, and A.7.13 apply to data center infrastructure. For SaaS organizations with no on-premises servers, these are typically marked as applicable in the Statement of Applicability, with the cloud provider's SOC 2 report or ISO 27001 certificate as supporting evidence, a justification statement, and a review of what the provider's controls cover.
  • Office and device controls: A.7.7 (clear desk and clear screen) and A.7.8 (equipment siting and protection) apply to the organization's own office and employee devices. An ISO auditor will expect a clear desk policy and documented equipment handling procedures wherever the servers are hosted.

Technological Controls: A.8.1 to A.8.34

12 of the 34 ISO 27001 technological controls map directly to a SOC 2 Security criterion: privileged access (A.8.2), malware protection (A.8.7), technical vulnerabilities (A.8.8), configuration management (A.8.9), data leakage prevention (A.8.12), logging and monitoring (A.8.15, A.8.16), software installation (A.8.19), network security and web filtering (A.8.20, A.8.23), cryptography (A.8.24), and change management (A.8.32). A.8.9 (configuration management) is Partial, because its only mapped criterion, CC5.2, carries a Partial overlap rating.

Annex A controlControl nameSOC 2 criteria that map to itCoverageWhat a SOC 2 holder still has to build
A.8.1User endpoint devices-Not coveredUser endpoint device standard
A.8.2Privileged access rightsCC6.1, CC6.3Full-
A.8.3Information access restriction-Not covered-
A.8.4Access to source code-Not coveredSource code access control procedure
A.8.5Secure authentication-Not coveredSecure authentication standard
A.8.6Capacity management-Not coveredCapacity management plan
A.8.7Protection against malwareCC6.6, CC6.8Full-
A.8.8Management of technical vulnerabilitiesCC7.1Full-
A.8.9Configuration managementCC5.2Partial-
A.8.10Information deletion-Not coveredInformation deletion procedure
A.8.11Data masking-Not coveredData masking standard
A.8.12Data leakage preventionCC6.7Full-
A.8.13Information backup-Not coveredInformation backup procedure
A.8.14Redundancy of information processing facilities-Not coveredRedundancy design for processing facilities
A.8.15LoggingCC7.2Full-
A.8.16Monitoring activitiesCC4.2, CC7.1, CC7.2Full-
A.8.17Clock synchronization-Not coveredClock synchronization standard
A.8.18Use of privileged utility programs-Not coveredPrivileged utility program controls
A.8.19Installation of software on operational systemsCC6.8Full-
A.8.20Networks securityCC6.6Full-
A.8.21Security of network services-Not coveredNetwork services security requirements
A.8.22Segregation of networks-Not coveredNetwork segregation design
A.8.23Web filteringCC6.6Full-
A.8.24Use of cryptographyCC6.1, CC6.7Full-
A.8.25Secure development life cycle-Not coveredSecure development life cycle procedure
A.8.26Application security requirements-Not coveredApplication security requirements specification
A.8.27Secure system architecture and engineering principles-Not coveredSecure system architecture and engineering principles
A.8.28Secure coding-Not coveredSecure coding standard
A.8.29Security testing in development and acceptance-Not coveredSecurity testing plan for development and acceptance
A.8.30Outsourced development-Not coveredOutsourced development security requirements
A.8.31Separation of development, test and production environments-Not coveredSeparation of development, test and production environments
A.8.32Change managementCC8.1Full-
A.8.33Test information-Not coveredTest data protection procedure
A.8.34Protection of information systems during audit testing-Not coveredAudit testing protection procedure

What Percentage of ISO 27001:2022 Annex A Does SOC 2 Cover?

In our mapping spreadsheet, the SOC 2 Security criteria (CC1 to CC9) map directly to 40 of the 93 Annex A controls, about 43 percent. The other 53 have no direct Security criterion and count as new work for a SOC 2 holder, alongside the ISMS clauses in the next section.

Annex A themeControlsCovered directly by SOC 2 Security criteriaFullPartialNo direct SOC 2 criterion
Organizational (A.5)3720 (54%)16417
People (A.6)84 (50%)314
Physical (A.7)144 (29%)4010
Technological (A.8)3412 (35%)11122
Total9340 (43%)34653

The 53 Annex A controls without a direct SOC 2 criterion, by theme:

  • Organizational (A.5), 17 controls: A.5.4, A.5.5, A.5.7, A.5.9, A.5.10, A.5.12, A.5.13, A.5.14, A.5.17, A.5.21, A.5.23, A.5.24, A.5.28, A.5.32, A.5.33, A.5.34, and A.5.36
  • People (A.6), 4 controls: A.6.5 (responsibilities after termination), A.6.6 (confidentiality agreements), A.6.7 (remote working), and A.6.8 (event reporting)
  • Physical (A.7), 10 controls: A.7.3 to A.7.9 and A.7.11 to A.7.13
  • Technological (A.8), 22 controls: A.8.1, A.8.3 to A.8.6, A.8.10, A.8.11, A.8.13, A.8.14, A.8.17, A.8.18, A.8.21, A.8.22, A.8.25 to A.8.31, A.8.33, and A.8.34

Key insight

What covered means in the ISO 27001 to SOC 2 mapping

The spreadsheet counts a control as covered only when a SOC 2 Security criterion maps to it directly. Many of the other 53 still benefit from SOC 2 work: Availability criteria produce evidence for capacity, backup, and redundancy (A.8.6, A.8.13, A.8.14), Confidentiality criteria for classification and labelling (A.5.12, A.5.13), and existing authentication and secure development controls often go a long way toward A.8.5 and A.8.25. Treat that as partial reuse, and confirm every control in the Statement of Applicability with your certification body.

What ISO 27001 Adds Beyond the Annex A Controls

ISO 27001 also requires the ISMS management clauses, which have no SOC 2 equivalent:

  • Clause 6.1.3, Statement of Applicability: lists all necessary controls, the justification for including each, whether each is implemented, and the justification for excluding any Annex A controls.
  • Clause 9.2, internal audit programme: a documented programme with defined frequency, methods, responsibilities, planning requirements, and reporting.
  • Clause 9.3, management review: documented reviews at planned intervals with required inputs and documented decisions on continual improvement.
  • Clause 10.2, nonconformity and corrective action: a documented process for identifying nonconformities, determining causes, implementing corrective actions, and reviewing their effectiveness.

The SOC 2 to ISO 27001 control mapping covers each clause in detail, including the required management review inputs.

Key insight

ISO 27001 timeline for SOC 2 holders

The typical timeline to ISO 27001 certification is 4 to 6 months for organizations with a mature SOC 2 program, compared with 9 to 12 months from scratch. Most of that time goes to building the ISMS management artifacts, completing an internal audit cycle, and scheduling the Stage 1 and Stage 2 external audits.

The SOC 2 vs ISO 27001 comparison covers how the two frameworks relate, including audit mechanics, certification timelines, and what carries over.

Adding ISO 27001 to SOC 2?

We map what transfers and build only the net-new work toward an effective security program.

Frequently Asked Questions About ISO 27001 to SOC 2 Mapping

How many ISO 27001 Annex A controls map to SOC 2?

In our mapping spreadsheet, the SOC 2 Security criteria (CC1 to CC9) map directly to 40 of the 93 ISO 27001:2022 Annex A controls, about 43 percent: 20 of 37 organizational, 4 of 8 people, 4 of 14 physical, and 12 of 34 technological. Of the 40, 34 are Full and 6 are Partial. The other 53 count as new work for a SOC 2 holder.

Which ISO 27001 controls have no SOC 2 equivalent?

In our mapping spreadsheet, 53 of the 93 Annex A controls have no direct SOC 2 Security criterion: 17 organizational, 4 people, 10 physical, and 22 technological. The tables above list each one with what a SOC 2 holder still has to build, such as threat intelligence (A.5.7), classification and labelling (A.5.12, A.5.13), and secure coding (A.8.28).

Can SOC 2 evidence be used for the ISO 27001 certification audit?

Yes, for the 40 Annex A controls a SOC 2 Security criterion maps to directly. Where the mapping is Full (34 controls), the same log or record goes into both audit packages. Where it is Partial (6 controls), existing evidence is a starting point that needs supplementing. The ISMS documents are ISO-specific and need to be built: the Statement of Applicability, internal audit reports, and management review records.

What is the difference between ISO 27001 and ISO 27002 in a SOC 2 mapping?

ISO 27001 defines the requirements for an information security management system and is what organizations certify against. ISO 27002 is the companion implementation guide, using the same 93 controls and the same numbering (5.x through 8.x). A mapping of ISO 27002 controls to SOC 2 uses the same Annex A structure as this post.

Does adding Availability or Confidentiality increase ISO 27001 overlap?

Yes. In our mapping spreadsheet, the Security criteria alone map directly to 40 of 93 Annex A controls. Availability criteria add evidence for capacity, backup, and redundancy (A.8.6, A.8.13, A.8.14), and Confidentiality criteria add evidence for classification and labelling (A.5.12, A.5.13) and partial coverage of data masking (A.8.11). Confirm each control in the Statement of Applicability.

Is there a spreadsheet version of the ISO 27001 to SOC 2 mapping?

Yes. The full mapping is a live Google Sheet that covers both directions: SOC 2 criteria to Annex A, and all 93 Annex A controls back to SOC 2 with what a SOC 2 holder still has to build. Google Sheets can export it to Excel through File, Download, Microsoft Excel.

Further Reading

Ready to Start Your Compliance Journey?

Get a clear, actionable roadmap with our readiness assessment.

Contact Us

Share this article:

Sample SOC 2 Control List

Input your email to download the list.

About the Author

Former security architect for Bank of Canada and Payments Canada. 20+ years building compliance programs for critical infrastructure.